The areas I work in, and the method behind each one.
Delay analysis and delay layering
Separating the delays on a civil engineering project by cause and responsibility, and measuring what each event did to the completion date.
Primavera P6MS ProjectAs-planned vs as-builtTime impact analysis
Building the baseline schedule
From the work breakdown structure to the critical path: a programme in Primavera P6 or MS Project with complete logic that a project can be controlled against.
Primavera P6MS ProjectWBSCPM
Schedule updates and progress control
Periodic updates, comparison against the baseline, deviations found and a corrective action proposed while there is still time to act.
Primavera P6MS ProjectBaseline comparisonProgress analysis
Project management the ICB way
Planning and control as part of managing a project rather than a separate task — grounded in the ICB Level D certificate and a degree in construction management.
ICB Level DConstruction management