حسن نادریراد
کارشناس ارشد مهندسی عمران، مدیریت ساخت — برنامهریزی و کنترل پروژه
برنامهی زمانبندی پروژههای عمرانی را تهیه، کنترل و بهروزرسانی میکنم؛ پیشرفت را تحلیل میکنم، انحرافها را زود پیدا میکنم و برایشان راهکار کنترلی پیشنهاد میدهم. مسلط به Primavera P6 و Microsoft Project، دارای گواهینامهی ICB Level D و مسلط به آنالیز و لایهبندی تأخیرات.
- Primavera P6
- Microsoft Project
- Delay analysis
- Delay layering
- ICB Level D
- Availability آمادهی همکاری — برنامهریزی و کنترل پروژه
در جستوجوی همکاری در برنامهریزی و کنترل پروژه، مدیریت ساخت و تحلیل تأخیرات پروژههای عمرانی.
Planning and control for your construction project
From the baseline schedule to periodic updates, progress reports and delay analysis — a programme that is actually used to make decisions, not just attached to the contract.
-
Baseline schedule
Work breakdown structure, activities, logic and calendars in Primavera P6 or MS Project — a fully linked programme with a clear critical path that can be controlled.
-
Updates and progress control
Periodic schedule updates, comparison against the baseline, progress analysis and deviations found before they turn into delay.
-
Delay analysis and layering
Delays separated by cause and responsibility, and the effect of each event on the completion date documented — a clear basis for extensions of time and negotiation.
-
Corrective action, not just a report
Every report comes with a proposed action — resequencing, fast-tracking or a recovery programme — grounded in ICB project management practice.
Selected work
Delay analysis and delay layering
Separating the delays on a civil engineering project by cause and responsibility, and measuring what each event did to the completion date.
OutcomeA documented report showing each event's and each party's share of the delay — a basis for an extension of time or a negotiation.
Building the baseline schedule
From the work breakdown structure to the critical path: a programme in Primavera P6 or MS Project with complete logic that a project can be controlled against.
OutcomeA baseline with complete logic, correct calendars and a clear critical path — the reference for every comparison that follows.
Schedule updates and progress control
Periodic updates, comparison against the baseline, deviations found and a corrective action proposed while there is still time to act.
OutcomeA periodic report that shows each deviation with its cause and proposes a concrete action for it.
What I work with
Core skill
Scheduling software
2- Primavera P6
- Microsoft Project
Planning & control
7- Baseline scheduling
- WBS
- CPM / critical path
- Schedule updating
- Progress analysis
- Variance analysis
- Corrective & recovery plans
Delay analysis
5- Delay analysis
- Delay layering
- As-planned vs as-built
- Time impact analysis
- Extension of time
Project management
3- ICB Level D
- Construction management
- Project control
Have something in mind?
For planning and controlling a construction project, a delay analysis, a role, or just a professional conversation — send a message.