Hassan Naderirad
Civil engineer, MSc in construction management — project planning and control
I prepare, control and update the schedules of civil engineering projects — analysing progress, finding deviations early and proposing the corrective action for each. Fluent in Primavera P6 and Microsoft Project, ICB Level D certified, and skilled in delay analysis and delay layering.
- Primavera P6
- Microsoft Project
- Delay analysis
- Delay layering
- ICB Level D
- Availability Open to work — project planning and control
Looking for work in project planning and control, construction management and delay analysis on civil engineering projects.
Planning and control for your construction project
From the baseline schedule to periodic updates, progress reports and delay analysis — a programme that is actually used to make decisions, not just attached to the contract.
-
Baseline schedule
Work breakdown structure, activities, logic and calendars in Primavera P6 or MS Project — a fully linked programme with a clear critical path that can be controlled.
-
Updates and progress control
Periodic schedule updates, comparison against the baseline, progress analysis and deviations found before they turn into delay.
-
Delay analysis and layering
Delays separated by cause and responsibility, and the effect of each event on the completion date documented — a clear basis for extensions of time and negotiation.
-
Corrective action, not just a report
Every report comes with a proposed action — resequencing, fast-tracking or a recovery programme — grounded in ICB project management practice.
Selected work
Delay analysis and delay layering
Separating the delays on a civil engineering project by cause and responsibility, and measuring what each event did to the completion date.
OutcomeA documented report showing each event's and each party's share of the delay — a basis for an extension of time or a negotiation.
Building the baseline schedule
From the work breakdown structure to the critical path: a programme in Primavera P6 or MS Project with complete logic that a project can be controlled against.
OutcomeA baseline with complete logic, correct calendars and a clear critical path — the reference for every comparison that follows.
Schedule updates and progress control
Periodic updates, comparison against the baseline, deviations found and a corrective action proposed while there is still time to act.
OutcomeA periodic report that shows each deviation with its cause and proposes a concrete action for it.
What I work with
Core skill
Scheduling software
2- Primavera P6
- Microsoft Project
Planning & control
7- Baseline scheduling
- WBS
- CPM / critical path
- Schedule updating
- Progress analysis
- Variance analysis
- Corrective & recovery plans
Delay analysis
5- Delay analysis
- Delay layering
- As-planned vs as-built
- Time impact analysis
- Extension of time
Project management
3- ICB Level D
- Construction management
- Project control
Have something in mind?
For planning and controlling a construction project, a delay analysis, a role, or just a professional conversation — send a message.